Ghts with all the increase in Anti-Obesity Compound Library site production drift spacing, indicating that the stope had the best mining effect when the sublevel height was 19 m.Fourth segment Average206.12 207.23.81 22.229.93 231.97.18 96.10.35 9.Metals 2021, 11,(1) Single-factor analysis In line with the numerical simulation drawing results, the single factor analysis of 16 7 of 20 schemes was carried out [30]. The difference in 5-Azacytidine Description between recovery and dilution ratio Y and sublevel height H and production drift spacing B is shown in Figure five.(a)(b)Figure 5.five. Connection from the difference between recovery and dilution ratio Y and sublevel height Figure Partnership with the distinction amongst recovery and dilution ratio Y and sublevel height HH and production drift spacing B: (a) connection curve of sublevel height H as well as the difference and production drift spacing B: (a) partnership curve of sublevel height H and the difference among recovery and dilution ratio Y;Y; (b) connection curve of production drift spacing B along with the involving recovery and dilution ratio (b) connection curve of production drift spacing B and the difference in between recovery and dilution ratio Y. difference amongst recovery and dilution ratio Y.(two) By analyzing the changing trend on the curve in Figure 5a, it may be seen that the Comprehensive evaluation distinction amongst recovery and dilution ratio at every production drift spacing initially inTable 2 demonstrates a quadratic polynomial with MATLAB (MathWorks, Natick, creased and after that decreased together with the boost in sublevel height. The distinction among MA, USA), along with the results are shown in Figure six. The vertex of your surface inside the figure recovery and dilution ratio when the production drift spacing was 20 m constantly rewas at a sublevel height of approximately 19 m, as well as the production drift spacing was mained the biggest compared with other production drift spacings using the increase in approximately 20 m. The quadratic function relation in the distinction involving recovery sublevel height, indicating that the mining effect was optimal when the production drift and dilution ratio Y concerning sublevel height H and production drift spacing B may be spacing was 20 m, along with the maximum worth was 86.54 at the sublevel height of 19 m. obtained via fitting evaluation, which may be expressed as: Metals 2021, 11, x FOR PEER Evaluation distinction in between recovery and dilution ratio enhanced from 85.16 to 86.54 , 17 8 of the with aY = -0.13H2 – 0.157B2 and a little change- 0.018HB production 2drift spacing was development ratio of 1.62 five.594H six.517B when the – 36.172(R = 0.8756) (11) 20 m as well as the sublevel height improved from 17.five m to 19 m, indicating that the values ranging from 17.5 m to 19 m were the appropriate sublevel heights. By analyzing the changing trend in the curve in Figure 5b, it might be observed that the distinction in between recovery and dilution ratio at every single sublevel height first elevated then decreased with the improve in production drift spacing. The difference involving recovery and dilution ratio when the sublevel height was 19 m continuously remained the biggest compared with other sublevel heights with all the increase in production drift spacing, indicating that the stope had the most effective mining impact when the sublevel height was 19 m. (2) Complete analysis Table two demonstrates a quadratic polynomial with MATLAB (MathWorks, Natick, MA, USA), plus the outcomes are shown in Figure six. The vertex of the surface in the figure was at a sublevel height of.